Cleaning Sandy Gully

d_0012961_cleaning_sandy_gully.jpg

Title

Cleaning Sandy Gully

Description

"Cleaning Sandy Gully: Some 100,000 cubic yards of silt and sand are being bulldozed from the floor of the Sandy Gully by the Ministry of Construction. The work began on Monday November 30 and was inspected on that day by the Minister of State in the and after heavy rainfall. A ministry, Hon. Robert new spillway costing contractor. Purpose of the shortly under the Constant. Spring Road Bridge which spans the gully at that point. In the background [above] is the Sandy Gully Bridge on the Spanish Town Road. Its abutments were threatened by years of accumulated sand and silt, hence the decision to clean the channel. Completion is expected by June."

Subject

Drainage - Jamaica; Sandy Gully (Kingston, Jamaica); Spanish Town Road (Kingston, Jamaica)

Creator

Daily News

Date

Aug-1982

Source

NLJ Photograph Collection IN: Daily News Collection

Identifier

D0012961
Acc. no.: 34826

Rights

The National Library of Jamaica (NLJ) charges a usage fee based on its ownership of the physical materials in its collections. This fee represents no claim to copyright or the issuance of permission as the copyright holder. The NLJ will only issue permission for use under copyright, when the copyright is owned to the NLJ; or such permission through the rights owner is agreed upon, for the NLJ to contractually issue permissions on one's behalf.

Payment of the usage fee does not constitute, and should not be viewed therefore, as permission by copyright holder to reproduce works that are copyrighted. Users are responsible for determining if the use they intend to make, invades copyright, rights to privacy, or other rights.

Format

JPEG

Type

Photograph

Citation

Daily News, “Cleaning Sandy Gully,” National Library of Jamaica Digital Collection , accessed September 15, 2025, http://45.33.1.181/items/show/12004.